BREEAM Case Study - British Red Cross - BREEAM Very Good
[edit] Project information
- Client: British Red Cross
- Design Team: Sursham Tompkins, Tompkins Robinson Surveyors,
- Main Contractor: Borras Construction
- Sustainability Consultant: Encon Associates
- Project Title: British Red Cross Resource Centre, Chelmsford
- Value: £1.25m
- Services Provided by Encon Associates: BREEAM Assessment 2011 New Construction Offices
- Rating: Very good
- Stage: Design stage
[edit] Design stage assessment
The design stage assessment, also called the interim stage, provides evidence of the building’s performance at the design stage of the buildings life cycle. Assessment and certification ideally occurs prior to the beginning of operations on site. The certified BREEAM rating at this stage is labelled as ‘interim’ because it does not represent the building’s final, new construction BREEAM performance.
To be able to complete an assessment at this stage the design must be advanced to a point that the relevant design information is available to enable the BREEAM Assessor to evaluate and verify the building’s performance against the criteria defined in this scheme document. The interim design stage assessment will therefore be completed and certified at the scheme design or detailed design stages.
Having worked closely with the design team throughout this project, the target of BREEAM Very Good for design stage is now complete, achieving it's required Very Good comfortably.
The ground floor includes a reception, training room, staff office and breakout room with a large open plan office, meeting room and hot desk area on the first floor. Externally, a new pedestrian walkway from the main road to the building was created along with a car park and new boundary walls.
[edit] Project management
With over 10 years of experience working in BREEAM and sustainable construction, Encon Associates implement the use of IES TaP into all schemes appointed for BREEAM assessment. This is an award winning software that allows Encon to easily manage the process and ensure transparency and personnel allocation to all credits targeted. Managing the project via IES TaP BREEAM software, has allowed all parties involved to have a live update on progress at all stages of the project.
For more info on IES TaP for BREEAM, click here: IES TaP for BREEAM Website
For more info on BREEAM Assessors Encon Associates, click here: Encon Associates Website
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.
Accommodating the Victorian and Edwardian working woman. Book review.